Question: do a cost breakdown structure an schedule breakdown structure and a work breakdown structure for the following proyect Design and construction of a house with
do a cost breakdown structure an schedule breakdown structure and a work breakdown structure for the following proyect
Design and construction of a house with 120 m2 of construction on two floors (each one of approx. 60 m2) - Garage for two cars Medium - high residential finishes (plaster, SW paint, porcelain tile, Kohler bathroom furniture, security access door main, duo-vent glass, etc.) Does not include: kitchens, closets, minisplits.

F27 : fic A B D E F G H K M N 0 mar P 1 duration start end estimated cost calculation Comments Acceptance criteria base budget jan feb mar June july aug $ $ $ 2 house 3 design phasee 4 preliminary studies 5 topographic survey 6 Study of soil mechanics 7 Design and engineering 8 Architectural design 9 Engineering design 10 Procedures and permits 11 Building permit 12 13 CONSTRUCTION PHASE 14 Preliminaries 15 Dirt roads 16 Construction 17 Foundation 18 structure 19 Brickwork 20 Interior finishes 21 Exterior finishes 22 Waterproofing 23 Electrical installation 24 Mechanical installation (hys) 25 26 27 28 29 30 31 F27 : fic A B D E F G H K M N 0 mar P 1 duration start end estimated cost calculation Comments Acceptance criteria base budget jan feb mar June july aug $ $ $ 2 house 3 design phasee 4 preliminary studies 5 topographic survey 6 Study of soil mechanics 7 Design and engineering 8 Architectural design 9 Engineering design 10 Procedures and permits 11 Building permit 12 13 CONSTRUCTION PHASE 14 Preliminaries 15 Dirt roads 16 Construction 17 Foundation 18 structure 19 Brickwork 20 Interior finishes 21 Exterior finishes 22 Waterproofing 23 Electrical installation 24 Mechanical installation (hys) 25 26 27 28 29 30 31
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts