Question: Do a WBS (Work Breakdown Structure) and Relationship between activities for tiling process using these activities: 1- Determining the level of the tile, 2- Choosing
Do a WBS (Work Breakdown Structure) and Relationship between activities for tiling process using these activities:
1- Determining the level of the tile, 2- Choosing the type of tiles, 3- Choosing type of concrete, 4- Contract with tiler, 5- Pouring the sand, 6- Choosing an insulation, 7- Arranging the tiles, 8- Grouting, 9- cleaning the tiles, 10- tilt adjustment.
or any activity you want to add.
WBS must be drawn as a hierarchy shape.