Question: Document3 Q Search in Document Review View *+ Share A DO OU A ED ANC- Home Insert Design Layout References Mailings Calibri (Body) 12 -AAAA

 Document3 Q Search in Document Review View *+ Share A DO

Document3 Q Search in Document Review View *+ Share A DO OU A ED ANC- Home Insert Design Layout References Mailings Calibri (Body) 12 -AAAA BIU.abe XX? ASA = Picture Format + 1 Abbcode = Paste = AaBbcode AaBbCcDc AaBbccDdE: AaBb No Spacing Heading 1 Heading 2 Tite = AaBbcodec Subtitle Normal Styles Pane TG corp's single predetermined overhead rate is $115 per direct labor hour. Under their ABC system they have 5 OH pools with the following rates: material handling $0.35 per part, lathe work $0.25 per lathe turn, milling $30 per machine hour, grinding $0.75 per part, and testing at $17 per unit tested. Based on the following information calculate the cost per unit for Job 421 using the single overhead system: Direct material cost per job: $10,000 (job 420), $60,000 (job 421) Direct manufacturing labor cost per job at $30/DLH: $750 (job 420). $12.000 (job 421) Parts per job: 500 parts (job 420), 2,000 parts (job 421) Lathe turns per job: 20,000 turns (job 420), 60,000 turns (job 421) Machine hours per job: 170 MH (job 420), 970 MH (job 421) Units per job (all units are tested): 10 unit (job 420), 200 units (job 421) Page 1 of 1 0 Words English (US) E = = Focus - - + 100%

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Accounting Questions!