Question: Dorben Co . provides a 1 0 % allowance for its operators. A work sampling study of one operator over an 8 - hour shift

Dorben Co. provides a 10% allowance for its operators. A work sampling study of one
operator over an 8-hour shift yields the following data. The average rated performance is
110%. The expected output is 50 units/shift.
a) Calculate the observed time in minutes for loading (min/unit)
b) Calculate the normal time for unloading (min/unit)
c) What is the overall standard time (min/unit)
d) What is the accuracy of the study (95% confidence)