Question: Draw a network diagram based on the following superintendent's notes (and only these notes). See example on page 33. The first two things I need
Draw a network diagram based on the following superintendent's notes (and only these notes). See example on page 33. "The first two things I need to do are apply for a permit and mobilize my forces. While the drawings are in for permitting, I can order the lumber for the walls and roof, order the roof trusses, and order the windows and custom door. Once I obtain the permit, I can actually start work at the site. First, I will need to place the edge forms. Once that is done, I can put in the underground electrical service. After that, I can dig the footing, install rebar, and pour the monolithic slab and footing. Any time after this but before the finish electrical work, I can put in the satellite dish. Now I can frame up the exterior walls. Once that is done, I can place the roof trusses and then put on the plywood sheathing, felt paper, and concrete roof tiles. While I am doing the roof work, I can have someone set the windows and custom door. Once that is done, they can put on the plywood and wall sheathing, felt paper, and cement siding panels. Once the roof is done, I can do the interior electrical rough-in. After the exterior wall finishes are done, I can start putting the ceiling and wall panels on the inside. Meanwhile, someone can paint the exterior. When the interior wall finish is done, I can paint the interior, then do the finish electrical work and lay the tile floor." book reference Construction Project Management 6 edition (pag 33)
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts