Question: - Draw product structure diagram for final product. Prepare MRP for component B. Child Items Lead time Current Inventory Final product 1 week 25 A

- Draw product structure diagram for final
- Draw product structure diagram for final product. Prepare MRP for component B. Child Items Lead time Current Inventory Final product 1 week 25 A (3 required) B (2 required) C (2 required) B (3 required) C (1 required) A 1 week none B none 200 2 weeks 1 week none none The MPS for final product: Week Number Quantity 1 1 5 6 2 3 0 0 75 0 100 125