Question: Draw the Gantt chart and calculate average waiting time using Round Robin scheduler. The time quantum is 3 . Use the following table. Draw the

Draw the Gantt chart and calculate average waiting time using Round Robin scheduler.
The time quantum is 3. Use the following table.
Draw the Gantt chart and calculate average waiting time using Priority scheduling. Use
the same table.
Use this table for both Q5 and Q6.
 Draw the Gantt chart and calculate average waiting time using Round