Question: Drawing 3 Culvert This is a section through a precast concrete box culvert beneath a road. Hereese the details 1 Project title recast Concrete Box

Drawing 3 Culvert
This is a section through a precast concrete box culvert beneath a road. Hereese the details
1 Project title recast Concrete Box Culvert beneath Road and Cycle path'
2 Culvert length to be 25m
31 in 100 fall
4 Backfill material will be Class 6N
5 Fill over the culvert consists of Class 6N
6 Culvert to have internal width of 2000mm
7 Culvert to have internal cross-sectional area of at least 3.9m2
8 Culvert to be manufactured and supplied by Marshalls Civil and Drainage (see their table of stock sizes)
9 Height between top of culvert and formation level of road above to be minimum 800mm
10 Top of culvert to be suitably waterproofed
11 No requirement for drainage layers alongside culvert
12 Benching of excavations to be 1 in 1
13 Original ground level located 2m below road level
Table of stock sizes by Marshalls Civil and Drainage
STOCK SIZES - Designed to suit LM1- LM3 loading with 0.300-2.00m cover
\table[[Reference,Eff. Area,\table[[Internal],[Dimensions]],,\table[[External],[Dimensions]],\table[[Normal],[Thickness]],\table[[Approx],[Weight]],],[Stock item,m.sq,Width m,Height m,Length m,Width m,Height m,Walsmm,Slabs mm,Tonnes],[MC 10.05,0.485,1.000,0.500,2.000,1.300,0.800,150,150,2.76],[MC 12.07,0.904,1.250,0.750,2.000,1.550,1.050,150,150,5.26],[MC 15.10,1.440,1.500,1.000,2.000,1.850,1.350,175,175,3.60],[MC 15.15,2.190,1.500,1.500,2.000,1.850,1.850,175,175,6.13],[MC 17.07,1.252,1.750,0.750,2.000,2.100,1.100,175,175,5.26],[MC 20.10,1.940,2.000,1.000,2.000,2350,1.350,175,175,6.13],[MC 20.20,3.940,2.000,2.000,2.000,2.400,2.400,200,200,9.06],[MC 25.15,3.690,2.500,1.500,1.500,2900,1.950,200,225,7.32],[MC 27.18 A,4.800,2.700,1.800,1.500,3.150,2.300,225,250,9.11],[MC 30.10 A,2.940,3.000,1.000,1.500,3.450,1.500,225,250,8.33]]
Corner Splays - MC.10.05-0.1500.050m MC.12.07-0.2250.075m All other sizes -0.3000.100m
Typical notes for drawing
1 THE TRENCH SHALL BE EXCAVATED TO A WIDTH EQUAL TO THE BOX CULVERT PLUS 600MM
2 BEDDING SHALL COMPRISE WELL COMPACTED SELECTED GRANULAR MATERIAL OVER THE FULL WIDTH OF THE TRNCH TO A MINIMUM DEPTH OF 200MM
3 BLIND THE SURFACE WITH FINE MATERIAL TO ASSIST IN LEVELLING
4 AN ALTERNATIVE TO GRANULAR BEDDING IS A 75MM THICK CONCRETE BLINDING LAYER
5 BACKFILLING SHOULD COMMENCE AS SOON AS POSSIBLE AFTER BOX CULVERTS HAVE BEEN LAID
6 FILL THE TRENCH TO THE LEVEL OF THE TOP OF THE BOX CULVERT WORKING EVENLY ON EACH SIDE
7 USE SELECTED BACKFII.I. MATERIAI, WEI. COMPACTED II 200MM
Drawing 3 Culvert This is a section through a

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!