Question: Drawing 3 Culvert This is a section through a precast concrete box culvert beneath a road. Hereese the details 1 Project title recast Concrete Box
Drawing Culvert
This is a section through a precast concrete box culvert beneath a road. Hereese the details
Project title recast Concrete Box Culvert beneath Road and Cycle path'
Culvert length to be
in fall
Backfill material will be Class
Fill over the culvert consists of Class
Culvert to have internal width of
Culvert to have internal crosssectional area of at least
Culvert to be manufactured and supplied by Marshalls Civil and Drainage see their table of stock sizes
Height between top of culvert and formation level of road above to be minimum
Top of culvert to be suitably waterproofed
No requirement for drainage layers alongside culvert
Benching of excavations to be in
Original ground level located below road level
Table of stock sizes by Marshalls Civil and Drainage
STOCK SIZES Designed to suit LM LM loading with cover
tableReferenceEff. Area,tableInternalDimensionstableExternalDimensionstableNormalThicknesstableApproxWeightStock item,msqWidth mHeight mLength mWidth mHeight mWalsmm,Slabs mmTonnesMC MC MC MC MC MC MC MC MC AMC A
Corner Splays MC MC All other sizes
Typical notes for drawing
THE TRENCH SHALL BE EXCAVATED TO A WIDTH EQUAL TO THE BOX CULVERT PLUS
BEDDING SHALL COMPRISE WELL COMPACTED SELECTED GRANULAR MATERIAL OVER THE FULL WIDTH OF THE TRNCH TO A MINIMUM DEPTH OF
BLIND THE SURFACE WITH FINE MATERIAL TO ASSIST IN LEVELLING
AN ALTERNATIVE TO GRANULAR BEDDING IS A MM THICK CONCRETE BLINDING LAYER
BACKFILLING SHOULD COMMENCE AS SOON AS POSSIBLE AFTER BOX CULVERTS HAVE BEEN LAID
FILL THE TRENCH TO THE LEVEL OF THE TOP OF THE BOX CULVERT WORKING EVENLY ON EACH SIDE
USE SELECTED BACKFII.I. MATERIAI, WEI. COMPACTED II
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
