Question: During and after the commissioning and turn-over process, the design and construction team need to provide the owner with many important documents for the operation

During and after the commissioning and turn-over process, the design and construction team need to provide the owner with many important documents for the operation of the building. These include all of the following, EXCEPT: Group of answer choices Design calculations for building systems. A list of things that the contractor secretly left out of the building to save costs. Samples and inventories of spare parts and materials used in the construction, to facilitate repairs. Final construction drawings, typically called "As Built" drawings. These incorporate any minor changes made during construction. Building Information Modeling (BIM) data, if included in the contract. Warranty, test-and-balance, and inspection documents. Operations and maintenance manuals for installed equipment

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!