Question: e ) You are an Engineer and note there are factory challenges. You go through some documentation for the past 6 months and you identify
e You are an Engineer and note there are factory challenges. You go through some documentation for the past months and you identify and tabulate the information in Table below:
Table Factory challeages and their impact
tableFactory challenge,Frequency,tableFactoryPoorts operator meter reading,Meter reading error,Silo failure,Conveyor failure,Pump failure,Dosing pump failure,Pump failure,Raw material quality,Gear box malfunction,Centrifuge Pump failure,
Using the information do a Pareto ABC Analysis and make recommendations to the Quality Control Manager.