Question: E4-12 Assigning Costs Using Traditional System, ABC System [LO 4-1, 4-3, 4-4. 4-5, 4-6] Bunker makes two types of briefcase, fabric and leather. The company

![4-4. 4-5, 4-6] Bunker makes two types of briefcase, fabric and leather.](https://dsd5zvtm8ll6.cloudfront.net/si.experts.images/questions/2024/09/66e40e8884bf8_96066e40e881e92b.jpg)
E4-12 Assigning Costs Using Traditional System, ABC System [LO 4-1, 4-3, 4-4. 4-5, 4-6] Bunker makes two types of briefcase, fabric and leather. The company is currently using a traditional costing system with labor hours as the cost driver but is considering switching to an activity-based costing system. In preparation for the possible switch, Bunker has identified two activity cost pools: materials handling and setup. Pertinent data follow: Number of labor hours Number of material moves Number of setups Fabric Case 28,000 660 Leather Case 8,000 1,340 217 Total estimated overhead costs are $367,500, of which $300,000 is assigned to the materials handling cost pool and $67,500 is assigned to the setup cost pool. Required 1. Calculate the overhead assigned to the fabric case using the traditional costing system based on direct labor hours. (Do not round intermediate calculations and round your final answer to the nearest whole dollar amount.) erhead Assigned
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
