Question: E4-12 Assigning Costs Using Traditional System, ABC System [LO 4-1, 4-3, 4-4, 4-5, 4-6] Bunker makes two types of briefcase, fabric, and leather The company

E4-12 Assigning Costs Using Traditional System, ABC System [LO 4-1, 4-3, 4-4, 4-5, 4-6] Bunker makes two types of briefcase, fabric, and leather The company is currently using a traditional costing system with labor hours as the cost driver but is considering switching to an activity-based costing system in preparation for the possible switch, Bunker has identified two activity cost pools: materials handling and setup. Pertinent data follow: Fabric Case 17.000 Number of labor hours Nurriter of maleriaal merves Number of sctups 560 Leather Case 11.000 1,040 135 Total estimated overhead costs are $249.800, of which $192,000 is assigned to the materials handling cost pool and $57,800 is assigned to the setup cost pool. Required: 1. Calculate the overhead assigned to the fabric Case using the traditional costing systern based on direct labor hours. (Do not round intermediate calculations and round your final answer to the nearest whole dollar amount.) Overhead Assigned 2. Calculate the overhead assigned to the fabric case using ABC. (Round activity rates or activity proportions, and intermediate calculations to four decimal places.) Overhead Assigned 3. Was the fabric case over or undercosted by the traditional cost system corripared to ABC? Fabric Case
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
