Question: Each section should cut through the entire building, Le from the roof through to the foundation. Each section has to cover structural elements and MEP

 Each section should cut through the entire building, Le from the

Each section should cut through the entire building, Le from the roof through to the foundation. Each section has to cover structural elements and MEP work. The drawings are to be your own original work. You may refer to textbooks and other resources but do not copy directly from these sources. The drawings can be hand sketched or developed using a program such as CAD. The drawings will need to include dimensions and annotations. _ Work Breakdown Structure Develop a Work Breakdown Structure (WBS) which identifies and organises the construction stage of the project and produce a Gantt chart for the WBS. "Identify work/sub work tasks and activities involved in the "Construction Stage" which should cover site preparation, building structure and MEP works. The W8S should cover level 3 in detail. o Include these tasks/activities in a Gantt chart format (use the template provided) and indicate the sequence of these tasks/activities described in Work Breakdown Structure. Please use the Assignment 3_Multi Arts Pavilion Project template (Microsoft Excel format) for the Gantt chart and project sequencing, which is available via

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!