Question: ( Empty System, Labor Utilization ) Consider a process consisting of three resources in a worker - paced line and a wage rateQ 4 .

(Empty System, Labor Utilization) Consider a process consisting of three resources in a worker-paced line and a wage rateQ4.2(Assign Tasks to Workers) Consider the following 6 tasks that must be assigned to 4 wo
line (i.e., a machine-paced line flow). Each worker must perform at least one task.
The current conveyor-paced assembly-line configuration assigns the workers in the following way:
Worker 1: Task 1
Worker 2: Task 2
Worker 3: Tasks 3,4
Worker 4: Tasks 5,6
a. What is the capacity of the current line? [4.1]
b. Now assume that tasks are allocated to maximize capacity of the line, subject to the conditions that (1) a worker can
of $10 per hour. Assume there is unlimited demand for the product.
a. How long does it take the process to produce 100 units starting with an empty system? [4.2]
b. What is the average labor content? [4.3]
c. What is the average labor utilization? [4.3]
d. What is the cost of direct labor? [4.4](Empty System, Labor Utilization) Consider a process consisting of three resources in a worker-paced line and a wage rate
of $10 per hour. Assume there is unlimited demand for the product

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!