Question: Establish priority-list for generation units in table below full-load average production cost method. Unit input-output function (H) fuel cost (c) full-load 1 570+ 8.1

Establish priority-list for generation units in table below full-load average production cost method. Unit input-output function (H) fuel cost (c) full-load 1 570+ 8.1 P + 0.01 P 1.7 720+77P+0.015P 1.3 2 3 4 5 6 810 +7.2P, +0.012 p 850+ 7.9P+0.02P 640 + 9.1 Ps+0.025 P 750 +8.8% +0.018 P 1.2 0.9 1 1.5 MW 250 300 MW MW 200 400MW MW 250 450 MW using
Step by Step Solution
3.31 Rating (163 Votes )
There are 3 Steps involved in it
Following is the calculation for the Full Load Average Production Units Full Load Full Load Avg Production Fuel Cost Full Load Avg Prod ... View full answer