Question: Estimate the time ( hours ) required to load 4 , 4 5 0 LCY of gravel from a stockpile into trucks using a bottom

Estimate the time (hours) required to load 4,450 LCY of gravel from a stockpile into trucks using a bottom dump hydraulic shovel with a bucket capacity of 8.72 LCY. Job Efficiency is 40 mins per hour an average swing angle is 180 degrees. Round your final answer to 2 decimal places.