Question: Everything I have found on this question says that question e. is correct at 42.5%. But it is telling me that it is wrong when

Everything I have found on this question says that question e. is correct at 42.5%. But it is telling me that it is wrong when I check my work. Am I supposed to put 57.5?Everything I have found on this question saysEverything I have found on this question says

Problem 6-5 As part of a major plant renovation project, the industrial engineering department has been asked to balance a revised assembly operation to achieve an output of 240 units per eight-hour day. Task times and precedence relationships are as follows: Duration Immediate Task (minutes) 0.2 0.4 Predecessor b 0.2 b 0.4 1.2 1.2 e, f 1.0 Do each of the following: b. Determine the minimum cycle time, the maximum cycle time, and the calculated cycle time. (Round your answers to 1 decimal place.) The minimum cycle time 1.2 minutes per unit 4.6 minutes per unit The maximum cycle time Calculated cycle time 2 minutes per unit c. Determine the minimum number of stations needed. (Round your answer to the next whole number.) 3 Minimum number of stations d. Assign tasks to workstations on the basis of greatest number of following tasks. Use longest processing time as a tiebreaker. If ties still exist, assume indifference in choice. Following Tasks A, B, D, C Work stations II II IV e. Compute the percentage of idle time for the assignment in part d. Use the actual bottleneck cycle time in your calculation. (Round your answer to 1 decimal place. Omit the "%" sign in your response.) Percentage of idle time 42.5 %

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!