Question: . EXAMPLE 01 For a project consisting of several activities, the durations and required resources carrying out each of the activities and their availabilities are

.
EXAMPLE 01 For a project consisting of several activities, the durations and required resources carrying out each of the activities and their availabilities are given below. (a) Draw the network, identify critical path and compute the total float for each activities. (b) Find the project completion time under the given resource constraints. Resources required 1-3 Activity Equipment Operators Duration (days) 1-2.30 + 1 20 3 2 20 6 2-+.30 2-5 Z 20 3-4 Y 20 3-5 1 20 +-5.30 6 Resources availability No. of operators 50, equipment X - 1. C31 equipment Y = 1, equipment 2-1 (C.A. (Final) Nov., 1985) E=4 L=4 E-04 LO 8 E=8 L-8 46 6 E = 14 L = 14 3 E-3 L=4 Fig. 14.97 = ) B I U D A S 1 2 III A EXAMPLE 01 For a project consisting of several activities, the durations and required resources carrying out each of the activities and their availabilities are given below. (a) Draw the network, identify critical path and compute the total float for each activities. (b) Find the project completion time under the given resource constraints. Resources required 1-3 Activity Equipment Operators Duration (days) 1-2.30 + 1 20 3 2 20 6 2-+.30 2-5 Z 20 3-4 Y 20 3-5 1 20 +-5.30 6 Resources availability No. of operators 50, equipment X - 1. C31 equipment Y = 1, equipment 2-1 (C.A. (Final) Nov., 1985) E=4 L=4 E-04 LO 8 E=8 L-8 46 6 E = 14 L = 14 3 E-3 L=4 Fig. 14.97 = ) B I U D A S 1 2 III AStep by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
