Question: Example 1 7 . 3 : A road expected to carry medium traffic is to be constructed in an area where the CBR value of

Example 17.3: A road expected to carry medium traffic is to be constructed in an area where
the CBR value of the subgrade is 10%. The base material chosen has a CBR value of 50%. No
sub-base is to be provided. Determine the thickness required for the base course and for the
surface course.