Question: EXAMPLE For a design flow of 3 . 8 MGD , effluent of chlorine based on activated sludge ( 1 5 m g L ,

EXAMPLE
For a design flow of 3.8 MGD, effluent of chlorine based on activated sludge (15mgL, determine both the lbs per day of sulfur dioxide and chlorine.
In addition, Davis and Cornwell state that chlorine is injected into the wastewater and is held in a basin for approximately 15 minutes. What is the volume and diameter of a chlorine contact tank?
Assume 1:1 for Cl2 and SO2.
Use two tanks
Depth of each tank is 10 feet.
7.48gal=1ft3
EXAMPLE For a design flow of 3 . 8 MGD , effluent

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock