Question: Example h f = 1 0 . 6 C 1 . 8 5 L D 4 . 8 7 Q 1 . 8 5 Cost

Example
hf=10.6C1.85LD4.87Q1.85
Cost relation for a specific municipal water supply project:
C=1563D3-5928.4D2+7696.9D-1611.4 for 0.5mD2.0m
Where,
C: cost of the pipe ($m)
D: pipe diameter (m)
Using William-Hazen Eqn with Cw=100,
plot the variation of the pipe cost with respect to capacity (Q) for the slope of 0.001.
The minimum required discharge is 0.5m3s.
The increase in cost with respect to capacity should be less than 300($m)(m3s).
Propose the optimum pipe size.