Question: Example Problem # 2 ( SI Units ) A new culvert at a roadway crossing is required to pass a 5 0 - year flow

Example Problem #2(SI Units)
A new culvert at a roadway crossing is required to pass a 50-year flow rate of 8.5m3s. Use the following site conditions:
EL Lnd::33.528m based on adjacent structures
Shoulder Elev: 34.595m
Elevation of Stream Bed at Culvert Face: 30.48m
Natural Stream Slope: 2 percent
Tailwater Depth: 1.219m
Approximate Culvert Length: 76.200m
Design a reinforced concrete box culvert for this installation. Try both square edges and 45degree beveled edges in a headwall. Do not depress the inlet (no FALL).
 Example Problem #2(SI Units) A new culvert at a roadway crossing

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Chemical Engineering Questions!