Question: Factory Basics Consider a 3-workstation production line with a single product that must be processed through station sequence 1-2-3. The following data are pertinent: Workstation

Factory Basics

Consider a 3-workstation production line with a single product that must be processed through station sequence 1-2-3. The following data are pertinent:

Workstation

Identical Machines

Average processing time Minutes/job

1

7

14

2

10

25

3

2

3

(a) Identify all parameters and list them with their respective values.

b.What are the bottleneck rate , the raw process time, , and the critical WIP ?

c.Compare the average cycle time when the WIP level is set at 20 jobs, under the assumptions of the best case, the worst case and the practical worst case.

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!