Question: Question #1 A production line is to be designed for a job with four tasks. The cycle times are 5.4 minutes, 2.8 minutes, 3.9 minutes,
Question #1
A production line is to be designed for a job with four tasks. The cycle times are 5.4 minutes, 2.8 minutes, 3.9 minutes, and 4.7 minutes. The raw process time is ______ and the bottleneck cycle time is ______ minutes.
Question #2
Consider the following three-station production line with a single product that must visit stations 1, 2, and 3 in sequence.
Station 1 has 3 identical machines with an average processing times of 5 minutes per job
Station 2 has 10 identical machines with an average processing time of 20 minutes per job.
Station 3 has 4 machines with average processing times of 3 minutes per job.
- How long does it take for a product to go through the entire production line?
- What is the cycle time of each station?
- What is the bottleneck rate for the production line and what station is it?
- Compute w0 for production line?
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock