Question: Falcon Manufacturing wants to know how many workstations minimum will be needed to manufacture a product consisting of steps and a total production time of

Falcon Manufacturing wants to know how many
Falcon Manufacturing wants to know how many workstations minimum will be needed to manufacture a product consisting of steps and a total production time of 8 minutes. The throughput required to meet demand is 400 units per day. Assume a work day of 7 hours. a. 6 workstations b. 7 workstations C. 8 workstations d. 9 workstations e. None of these alteratives is correct. 1.25 por QUESTION 37 For Palcon Manufacturing in the problem above, calculate the efficiency of the line if it was the minimum number of workstations required as just calculated above taken in relation to the local production time required of mine a less than 70% b. more than 70% but less than 80% C. more than 80% but less than 90% d. more than 90% but less than 100% e. None of these alternatives is correct

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock