Question: FIGURE 1 0 . 4 8 . Building Foundation Plan.FIGURE 1 0 . 5 3 . Wall Section . 1 - You need to estimate
FIGURE Building Foundation Plan.FIGURE Wall Section You need to estimate the amount of excavation required for the basement in the figures.
You also need to estimate the amount of backfill required to be place in the excavation
after the footing and the wall hare poured.
The specifications indicate the following:
The soil has a swell factor of
The soil has a shrinkage factor of
A foot working distance is required.
The excavation will be sloped :
You need to estimate the cost of the excavation in one above using the following
information:
Required equipment Backhoe with a cubic yard bucket.
Mobilization hours
Productivity of the backhoe LCY per hour
Equipment cost $ per hour
Operator cost $ per hour
Solve question and and show all work. There are other example on chegg with the same figure just different questions. Make sure to answer all questions.
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock