FIGURE 10.48. Building Foundation Plan.FIGURE 10.53. Wall Section.1- You need to estimate the amount of excavation required for the basement in the figures.
2- You also need to estimate the amount of backfill required to be place in the excavation
after the footing and the wall hare poured.
The specifications indicate the following:
The soil has a swell factor of 25%.
The soil has a shrinkage factor of 97%.
A 4-foot working distance is required.
The excavation will be sloped 2:1.
3- You need to estimate the cost of the excavation in one above using the following
information:
Required equipment - Backhoe with a 1.5 cubic yard bucket.
Mobilization -3 hours
Productivity of the backhoe -75 LCY per hour
Equipment cost - $76.50 per hour
Operator cost - $36.25 per hour
Solve question 1,2 and 3 and show all work. There are other example on chegg with the same figure just different questions. Make sure to answer all 3 questions.
FIGURE 1 0 . 4 8 . Building Foundation

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!