Question: Figure 1 1 . 8 is the network for the Largesse Hydro Project: Figure 1 1 . 8 Largesse Hydro Project. The following table gives
Figure is the network for the Largesse Hydro Project:
Figure
Largesse Hydro Project.
The following table gives the baseline cost and time estimates BCE and BTE the cost and time estimates to correct for failure, and the likelihood of failure for each work package.
tableWBS Elerment,BCE,CorrectiveBTE wkCost,Ttime,Likelihood$$V$$T$$U$$S$$J$$R$$C$$
a Determine the risk time and risk cost for all the WBS elements of the project.
b Consider the risk times on noncritical paths. Which activities and paths should be watched carefully as posing the highest risks?
c What is the project expected cost EC and expected time ET