Question: Final Project Objective : Prepare major components of a project which will reinforce key learning objectives learned during the term Basis: The Pom+ Project located
Final Project
Objective: Prepare major components of a project which will reinforce key learning objectives learned during the term
Basis: The Pom+ Project located in Appendix two of Project Management Textbook
Major 6 Deliverables:
- Scope Document
- Activity on Node (AON) Network Diagram
- Project Schedule & Cost
- Project NPV
- Communication Plan
- Risk Assessment Form/Risk Response Matrix
*** Submit your project using either PowerPoint, Word, and/or Excel your option
Scope Document
Read page 639-641, the POM+ project introduction. Use the Project Scope Checklist on page 107-110 as your template. Please read the denition of each one of the 8 sections to ensure understanding.
Additional items to consider:
- The Drink must come in three colors: Blue, Yellow and Red
- Calories per serving must be < 125
- Build a new manufacturing line for the drink
- Pilot the drink in Europe Market
- Meet rating of 4 of 5 on Market Research Taste Tests before release to market
- Technion Institute of Technology must evaluate for antitoxin levels
Activity on Node (AON) Network Diagram
Create an AON diagram using the 2 AON videos (in D2L) and figure 6.8 in the book as your guide. On page 641, you will find the WBS activities and their duration, along with Predecessor(s). Dont forget to watch the second video on Finish to Start with Lag. Please ensure you highlight the critical path. There can be more than one critical path. You can use Word or PowerPoint to display your AON.
Project Schedule & Cost
Use WBS activity costs provided (see Excel) to calculate total project cost. Project overhead is 20% of total WBS activity cost. Show cost with and without overhead costs.
Using your WBS Outline, AON, and the rules listed on page 640 in the book, create a schedule (use dates) in Excel with the below column headings. Also, under Part 1 on page 640, use the listed rules in items 2,3,4,5, and 6 to identify the dates. Ignore items 1 and 7. Each row/activity should have the below columns completed
WBS Task ID Task Name Start Date Finish Date Late Start Date Late Finish Date Slack Days total
Project NPV
Given the provided 5 year cash inflows (see Excel) calculate the project NPV. The discount rate will be 12% for the project. Show the project NPV with and without overhead (i.e. you need to calculate NPV using WBS costs first, then recalculate NPV after you add-in overhead). However, your recommendation should be based on total project cost (WBS activity cost + overhead). Provide a recommendation to approve / reject the project include your rationale
Remember that the initial investment (outflow) for NPV calculation is total WBS costs then recalculate NPV using total WBS costs + Overhead
Communication Plan
Use figure 4.10 as your guide to create a communication plan. Additional information:
- Stakeholders: CEO, CMO, CFO, Project Team, PM, VP-Manufacturing, VP-Production Design, Project Steering Committee, Technion Institute of Technology, Market Research Group
- Items: Project Status, Budget Status, Change Requests, Risk Assessment Report, Market Research Report, and Antitoxin Report
- Limit the plan to max 7 rows but no less than 5 rows
Risk Assessment Form/Risk Response Matrix
- Prepare Risk Assessment Form & Risk Response Matrix.
- Conduct a risk analysis of the project and prepare the results using figures 7.6 and 7.8 in the book as your guides.
- List a minimum of 5 possible risks, but no more than 7 risks