Question: Final Project The final project for this course is to create a work breakdown structure (WBS) for a construction project using MS Project 2019. The
Final Project The final project for this course is to create a work breakdown structure (WBS) for a construction project using MS Project 2019. The project is to build a new single-family home in a suburban area. The project team will consist of a project manager, an architect, a general contractor, electricians, plumbers, carpenters, painters, and other skilled tradespeople. The WBS will be created in three levels to break down the project into manageable tasks. The project schedule will be developed using MS Project 2019 to determine the critical path and identify any potential delays. Resource requirements will be chosen to ensure that the necessary personnel are available throughout the project (The project details are provided at the end). Project Management Report The project management report for this construction project will include the following details: Project Scope: The report will outline the scope of the project, including the objectives, deliverables, constraints, assumptions, and boundaries. Work Breakdown Structure: The report will include a detailed WBS with three levels of breakdown along with the duration of each activity. Project Schedule: The report will include a project schedule developed using MS Project 2019 that identifies the critical path and potential delays. Resource Plan: The report will outline the resource requirements for the project, including types of resources needed, quantities required, and a plan for managing resources. Risk Management Plan: The report will include a risk management plan that identifies potential risks to the project and strategies for mitigating those risks. Stakeholder Management Plan: The report will outline a stakeholder management plan that identifies all project stakeholders and strategies for managing stakeholder expectations. Project Governance Structure: The report will outline the governance structure for the project, including the roles and responsibilities of team members. Budget: The report will include a project budget outlining all costs associated with completing the project. Conclusion: The report will conclude with a summary of the project, including any challenges faced during the project, along with lessons learned. By completing this final project using MS Project 2019 to create a WBS with the duration of each activity along with the predecessors' table, students will have gained experience in managing a construction project from initiation to closure using MS Project 2019 and writing a comprehensive project management report. Project Details Level 1: Project Phases Phases Duration Project Initiation 2 Planning 4 Site Preparation 2 Foundation and Footings 4 Framing and Roofing 6 Electrical and Plumbing Rough-In 4 Insulation and Drywall 4 Interior Finishes 6 Exterior Finishes 6 Final Inspection and Cleanup 2 Level 2: Deliverables 1.1 Define project scope 1.2 Identify stakeholders 1.3 Develop project charter 2.1 Create WBS 2.2 Define project schedule 2.3 Determine resource requirements 2.4 Develop a risk management plan 3.1 Obtain necessary permits and approvals 3.2 Clear site of debris and hazardous materials 3.3 Install temporary fencing and signage 4.1 Excavate foundation area 4.2 Pour concrete footings and foundation walls 5.1 Install framing for walls, floors, and roof 5.2 Install roof sheathing and shingles 6.1 Install electrical wiring and plumbing pipes before walls are closed up 7.1 Install insulation in walls, floors, and attic space 7.2 Hang drywall on walls and ceilings 8.1 Install flooring, cabinets, countertops, and fixtures 9.1 Install siding, windows, doors, and trim work 10.1 Conduct final inspection to ensure compliance with building codes and regulations 10.2 Clean up the job site Level 3: Work Packages 1.1 Define project scope Review project requirements with stakeholders Identify project objectives Define project boundaries Identify constraints Identify assumptions Document scope statement Obtain approval from stakeholders 1.2 Identify stakeholders Identify all stakeholders Determine stakeholder expectations Analyze stakeholder needs Develop a stakeholder management plan Obtain approval from stakeholders 1.3 Develop project charter Define high-level project objectives Identify key stakeholders Define roles and responsibilities Establish a project governance structure Obtain approval from stakeholders 2.1 Create WBS Break down deliverables into smaller components Organize components into a hierarchical structure Assign unique identifiers to each component Obtain approval from stakeholders 2.2 Define project schedule Determine task dependencies Estimate task durations Develop a Gantt chart or network diagram Obtain approval from stakeholders 2.3 Determine resource requirements Identify types of resources needed Estimate quantities of resources needed Develop resource plan Obtain approval from stakeholders 2.4 Develop a risk management plan Identify potential risks to the project Assess the likelihood and impact of each risk Develop a risk response plan for each risk Obtain approval from stakeholders 3.1 Obtain necessary permits and approvals Research local regulations and requirements Submit permit applications as required Obtain necessary approvals before proceeding with work on site 3.2 Clear site of debris and hazardous materials Remove all debris from the site, including trees, rocks, etc. Dispose of hazardous materials properly according to regulations 3.3 Install temporary fencing and signage Install temporary fencing around the perimeter of the site Post signage indicating that construction is in progress 4.1 Excavate foundation area Mark out the foundation area according to the plans Excavate soil to the required depth Level foundation area 4.2 Pour concrete footings and foundation walls Build forms for footings Pour concrete for footings Build forms for foundation walls Pour concrete for foundation walls 5.1 Install framing for walls, floors, and roof Build a frame for walls, floors, and roof according to plans Install structural components such as beams and columns 5.2 Install roof sheathing and shingles Install roof sheathing Install roofing material such as shingles or tiles 6.1 Install electrical wiring and plumbing pipes before walls are closed up Install electrical wiring according to plans Install plumbing pipes according to plans 7.1 Install insulation in walls, floors, and attic space Install insulation in walls and floors according to plans Install insulation in attic space according to plans 7.2 Hang drywall on walls and ceilings Hang drywall on walls and ceilings according to plans 8.1 Install flooring, cabinets, countertops, and fixtures Install flooring according to plans Install cabinets and countertops according to plans Install fixtures such as sinks, toilets, and showers according to plans 9.1 Install siding, windows, doors, and trim work Install siding according to plans Install windows and doors according to plans Install trim work such as baseboards and crown molding according to plans 10.1 Conduct final inspection to ensure compliance with building codes and regulations Inspect all work completed on the project Ensure compliance with building codes and regulations 10.2 Clean up the job site Remove all debris from the site Dispose of hazardous materials properly Task Predecessors Planning Project Initiation Site Preparation Planning Foundation and Footings Site Preparation Framing and Roofing Foundation and Footings Electrical and Plumbing Rough-In Framing and Roofing Insulation and Drywall Electrical and Plumbing Rough-In Interior Finishes Insulation and Drywall Exterior Finishes Interior Finishes Final Inspection and Cleanup Exterior Finishes
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
