Question: Find: 1 . The AOA network and the path with the longest expected duration. 2 . All event slacks. 3 . Critical path to event
Find:
The AOA network and the path with the longest expected duration.
All event slacks.
Critical path to event D
The probability of completing the path with the longest expected duration in days.
The effect if CD slips to days; to days; to days.
Activity TE
AB
AC
AD
DC
CB
DE
CF
BF
IJ
CE
EF
FG
FH
EH
GH
EJ
GI
HJ
a Draw the AOA diagram.
b Find the critical path.
c Find the expected project completion time.