Question: first picture is an example of the problems and second picture of the problems i actually need help on please and thank you! this other
first picture is an example of the problems and second picture of the problems i actually need help on please and thank you!
seis tabilased and sample meins and raket were computad The resuls wore Refer to Table S6.1 - Foctors for Comouting Cantrol Chart Limits (3. sigma) for this problemi. Twelve samoles, ehch contaning five parts, were taken from a process that produces stool rods at Emmanual Kodzis factory. The lengnt of each rod in the samples was determined. The rosults were tabulated and bamplo monens and ranges were coenputed. The resuilts were: For the gren data, the x. inches (round your response fo four decimal places). Baved on the samping done, the conted limits for 3 s.gna x chart are Upper Control Limit (ucty) = inches (round yout response to four Definition Meena Cravan Comig 's computer chip production process yields DRAM chips with an avorage lle of 1,800 hours and =100 hours. The lolerance upper and lower specification fimits are 2.400 hours and 1,600 hqurs, respectively. Based on the given inforrnation, the procoss capobisty rato, Cp=1,33 (round your response to two decinal places). Eased on the process capablity ratio (Cp) for the given information, one can say that the process is of producing the chips to the design specifications For the given informution, the procoss cipabitty index.(C,e) * (round your iesponse to two decimal places): seis tabilased and sample meins and raket were computad The resuls wore Refer to Table S6.1 - Foctors for Comouting Cantrol Chart Limits (3. sigma) for this problemi. Twelve samoles, ehch contaning five parts, were taken from a process that produces stool rods at Emmanual Kodzis factory. The lengnt of each rod in the samples was determined. The rosults were tabulated and bamplo monens and ranges were coenputed. The resuilts were: For the gren data, the x. inches (round your response fo four decimal places). Baved on the samping done, the conted limits for 3 s.gna x chart are Upper Control Limit (ucty) = inches (round yout response to four Definition Meena Cravan Comig 's computer chip production process yields DRAM chips with an avorage lle of 1,800 hours and =100 hours. The lolerance upper and lower specification fimits are 2.400 hours and 1,600 hqurs, respectively. Based on the given inforrnation, the procoss capobisty rato, Cp=1,33 (round your response to two decinal places). Eased on the process capablity ratio (Cp) for the given information, one can say that the process is of producing the chips to the design specifications For the given informution, the procoss cipabitty index.(C,e) * (round your iesponse to two decimal places)

this other problem is one i need help with as well! please and thank you

Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
