Question: First: Using the data set provided (through period 5), create the following four (4) project documents: S-Curve (requires PV, EV, AC, and BAC to complete)

First: Using the data set provided (through period 5), create the following four (4) project documents:

  • S-Curve (requires PV, EV, AC, and BAC to complete)
  • Variance and Indices
  • To-Complete Performance Index (TCPIEAC and TCPIBAC) (requires ETC, EAC, VAC to complete)
  • S-Curve (with variance indicators)
First: Using the data set provided (through period 5), create the following

Actual Cost (AC) of Work Performed WBS Task Name 1.1.1. 1.1.2 1.1.3. 1.1.4. 1.2.1. 1.3.1. 1.3.2. 1.4.1. 1.5.1. 1.6.1. 1.6.2. 1.6.3. 1.6.4. 1.7.1. 1.8.1. Frame Handlebar Fork Seat Crank set Front wheel Back wheel Braking system Shifting system Integration Assembly Test Checkout PM Engineering Wk1 Wk2 1700 1500 3900 4000 4000 4000 3600 3600 L) 1000 2550 4000 4200 4000 3600 Wk 4 1600 4000 4100 4000 3600 L s 2000 4000 3600 Earned Value WBS Task Name 1.1.1. 1.1.2. 1.1.3. 1.1.4. 121. 1.3.1. 132 1.4.1. 1.51. 1.6.1. 16.2. 1.6.3. 164. 1.7.1. 1.8.1. Frame Handlebar Faork Seat Crank set Front wheel Back wheel Braking system Shifting system Integration Assembly Test Checkout PM Engineering TBC 400 400 400 440 360 1560 1040 1144 1040 600 1200 1920 480 8800 7920 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Ll Wk 2 L) Wk 4 35% 40% 25% 65% 35% 25% 25% 25% 25% 40% 40% 5% 5% 5% 5% 5% 5% 5% 5% L Wk 6 Wk 7 60% 20% 5% 5%

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!