Question: Flow Process Chart: Draw a flow process chart for the problem 1 3 given in the attached sheet. There is no need to draw proposed
Flow Process Chart:
Draw a flow process chart for the problem given in the attached sheet.
There is no need to draw proposed flow process chart. Exploratoryanalysishasidentifiedthe followingjob as a problemarea.Completea
flow processchart materialtype for the following enginestripping,cleaning,and
degreasingoperation.
Enginesarestoredin the oldenginestoreroom.Whenneeded,an engineis picked
up by an electrichoiston a monorail,transportedto the strippingbay,and unloaded
onto an enginestand.Therethe operatorstripsthe engine,putting the engineparts
into the degreasingbasket.The basketis transportedto the degreaser,loadedinto the
degreaser,degreased,and then unloadedfrom the degreaser.The basketwith de
greasedenginepartsis thentransportedto the cleaningarea,wherethe partsare sim
ply dumpedon the ground for drying. After severalminutesof drying, the partsare
lifted to the cleaningbenchesand cleaned.The cleanedpartsarecollectedin special
trays to await transport.The parts are loaded onto a trolley and transportedto the
inspectionstation.Theretheyare slid from the traysontothe inspectionbenches.
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
