Question: Following processes are being scheduled using a preemptive, roundrobin scheduling algorithm. Each process is assigned a numerical priority, with a higher number indicating a higher

Following processes are being scheduled using a preemptive, roundrobin

scheduling algorithm. Each process is assigned a numerical

priority, with a higher number indicating a higher relative priority.

In addition to the processes listed below, the system also has an idle

task (which consumes no CPU resources and is identified as I ). This

task has priority 0 and is scheduled whenever the system has no other

available processes to run. The length of a time quantum is 5 units.

If a process is preempted by a higher-priority process, the preempted

process is placed at the end of the queue.

a. Show the scheduling order of the processes using a Gantt chart.!

Following processes are being scheduled using a preemptive, roundrobin scheduling algorithm. Eachprocess is assigned a numerical priority, with a higher number indicating a

Thread P1 P2 P3 P4 P5 P6 Priority 20 30 20 35 5 15 Burst 30 20 10 25 5 10 Arrival 0 20 50 65 95 105 b. What is the turnaround time for each process? TAT p1 p2 p3 p4 p5 Ip6 c. What is the waiting time for each process? WT p1 p2 p3 Ip4 Ip5 |p6 d. What is the CPU utilization rate? Round of to two decimal places

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Databases Questions!