Question: For a certain industrial zone, the maximum and minimum power demands are 40 MW and10 MW respectively. Its load duration curve can be approximated as

For a certain industrial zone, the maximum and minimum power demands are 40 MW and10 MW respectively. Its load duration curve can be approximated as shown in figure Q4.1. The hydropower available at the time of a minimum regulated flow is just sufficient to cater to a peak load of 50 MWh/day. Further, it has been observed that it will be economical to pump water from tailrace to the reservoir by utilizing the steam power plant during the off-peak periods and thus running the station at a 100% load factor. Determine the maximum capacity of the pump storage hydro plant and the steam plant. Assume the efficiency of the steam conversion to be 60%.

Demand (MW) 24 Time (hrs.) Figure Q4.1: Load Duration Curve

40 Demand (MW) 10 0 Time (hrs.) Figure Q4.1: Load Duration Curve 24

Step by Step Solution

3.45 Rating (165 Votes )

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock

To determine the maximum capacity of the pump storage hydro plant and the steam plant follow these steps Step 1 Calculate Total Energy Demand The area ... View full answer

blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Electrical Engineering Questions!