Question: For a given project, duration and resource requirements are given below [3+4] Resources AVAILABILITY: (A) Machines 3 (B) Men 40 a) Draw the network diagrm,

 For a given project, duration and resource requirements are given below

For a given project, duration and resource requirements are given below [3+4] Resources AVAILABILITY: (A) Machines 3 (B) Men 40 a) Draw the network diagrm, Identify the critical path assuming that there are no resource constraints. b) Draw the time scale network as per EST and level the resources