Question: For a production line with two workstations which is run as a ConWIP pull system, the first workstation has a single machine with processing times

For a production line with two workstations which is run as a ConWIP pull system, the first workstation has a single machine with processing times of 50 minutes on average; and the second workstation also has a single machine with processing times of 1 hour on average. If the WIP cap on the line is 10 units, calculate the following:

Calculate the throughput and the cycle time of the line assuming practical worst-case performance.