Question: table [ [ Part Type, table [ [ Workstation / ] , [ Process Time ] ] , table [ [ Workstation

\table[[Part Type,\table[[Workstation/],[Process Time]],\table[[Workstation/],[Process Time]],\table[[Workstation/],[Process Time]]],[Part 1,A,C,],[Part 2,5.5,9.5,13.5,8.5,14.1,19.7,],[,A,B,C],[Part 3,8.9,13.5,18.1,9,15,21,4.3,8.5,12.7],[,A,B,],[Part 4,8.4,12,15.6,5.3,9.5,13.7,]]
Assume that the transfer time between arrival and the first station, between all stations, and between the last station and the system exit is 3 minutes. Use the Sequence feature to direct the parts through the system and to assign the processing times at each station. Use the Sets feature to collect cycle times (total times in system) for each of the part types separately. Animate your model (including the part transfers), run the simulation for a single replication of length 10,000 minutes, and collect statistics on the average part cycle time (report this in a text box in your Arena model file).7-4 A part arrives every 10 minutes to a system having three workstations (A, B, and C), where each workstation has a single machine; the first part arrives at time 0. There are four part types, each with equal probability of arriving. The process plans for the four part types are given here. The entries for the process times are the parameters for a triangular distribution (in minutes).[[Part Type,[[Workstation/],[Process Time]],[[Workstation/],[Process Time]],[[Workstation/],[Process Time]]],[Part 1,A,C,],[Part 2,5.5,9.5,13.5,8.5,14.1,19.7,],[,A,B,C],[Part 3,8.9,13.5,18.1,9,15,21,4.3,8.5,12.7],[,A,B,],[Part 4,8.4,12,15.6,5.3,9.5,13.7,]] Assume that the transfer time between arrival and the first station, between all stations, and between the last station and the system exit is 3 minutes. Use the Sequence feature to direct the parts through the system and to assign the processing times at each station. Use the Sets feature to collect cycle times (total times in system) for each of the part types separately. Animate your model (including the part transfers), run the simulation for a single replication of length 10,000 minutes, and collect statistics on the average part cycle time (report this in a text box in your Arena model file). PLEASE ASSIST WITH QUESTION NUMBER 7-4. SHOW ALL STEPS
 \table[[Part Type,\table[[Workstation/],[Process Time]],\table[[Workstation/],[Process Time]],\table[[Workstation/],[Process Time]]],[Part 1,A,C,],[Part 2,5.5,9.5,13.5,8.5,14.1,19.7,],[,A,B,C],[Part 3,8.9,13.5,18.1,9,15,21,4.3,8.5,12.7],[,A,B,],[Part 4,8.4,12,15.6,5.3,9.5,13.7,]] Assume that

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!