Question:
For a vending machine project, the site cost = 12,000 SR/month, the material cost = 1 SR/unit, and insurance cost = 500 SR/month, the labor cost = 1,500 SR/month, unit price = 3 SR/unit, and electricity cost = 1,000 SR/month and = 0.5 SR/unit.
a) Find the Unit Contribution and the Breakeven Quantity.
b) Determine the Total Contribution and Total Profit at sales of Q = 15,000 units.