Question: For each problem, clearly state your defined variables and equations. Round all numbers to at least 2 decimal points. Submit only 1 Word or PDF

For each problem, clearly state your defined variables and equations. Round all numbers to at least 2 decimal points. Submit only 1 Word or PDF file.
1.(Process analysis 40 pts.)
Galahad, the owner of a small dry-cleaning service, wants you to help optimize his business. First, the receptionist takes 5 minutes to receive payment for a load of clothing, collect the clothing and note any stains or tears. The clothing load is then placed into one of four washing machines, taking 25 minutes each. Two employees then iron the clothing, taking typically 15 minutes for each load.
a) What is the capacity of the process in terms of loads, and which step is the bottleneck?
b) What is the average theoretical flow time for one load to go through the entire process (i.e., without including
waiting)?
c) Galahad would like to hire another employee at the ironing step. If the additional employee costs $25.00 per
hour, and profit averages $12.00 per customer load, should Galahad hire the new employee? Assume demand is 10 customer loads per hour.
2.(Process analysis 30 pts.)
To prepare for a festivals potluck, Griselda decides to make homemade falafel. After a grueling three hours, she manages to fry a total of 270 falafels.
a) Her pot size currently fries 20 falafels at a time. How long is each falafel fried for? Hint think of the pot as the amount of inventory in our system.
b) Griselda is considering purchasing a larger pot that can fry as many falafels as she wants per batch. To cook them to perfection, each batch of falafels is fried for 12 minutes. If she wants to continue producing falafels at her current rate of 270 per 3 hours, how many falafels on average should be fried per batch? Should she purchase a larger pot?
3.(Quality analysis 30 pts.)
Walter is a chemical engineer that is monitoring the production of a common cleaning solution in being able to remove germs. Walter measures the germ level of 12 batches each day of the week to determine whether the process is in control or not. Historically, the cleaning product is working fine if the average germ rate is 20 parts per million and the range is 1.5 parts per million (germ levels that are too high or low are both indicators that the process is out of control. (Note: if is needed, let =3).
20.44 Germ range (ppm)0.732.881.032.350.402.620.32
a) Which two types of control chart should be used? Hint: use the most standard charts for this type of process.
b) For each of your two charts,
a. What is the upper control limit? b. What is the lower control limit? c. Draw the chart.
c) After viewing both charts, do you think the process is (more likely) in control or not?

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!