Question: For Questions 24-28 Using Chase plus overtime strategy (i.e., use overtime when demand exceeds maximum capacity of 10,000 units). calculate total cost of the 6-periods
For Questions 24-28 Using Chase plus overtime strategy (i.e., use overtime when demand exceeds maximum capacity of 10,000 units). calculate total cost of the "6-periods (months) production plan". (10 points) Note: You are strongly encouraged to show your work in the chart below, specifically in those numbered boxes which vou will need to answer the multiole-choice auestions below. EHOW AL YOUR WORK DY THE WORKSHEET The required number of people in period 3 (i.e., Box 21) would be a. 80 b. 60 c. 90 d. 70 e. 100