Question: For the CPM/PERT network in Problem , determine the probability that the network duration will exceed 50 months. I need the answer formatted in Excel
For the CPM/PERT network in Problem , determine the probability that the network duration will exceed 50 months.

I need the answer formatted in Excel using formulas.
The precedence is posted in the above chart.
Time Estimates (mo.) Activity Time Estimates (mo.) ActivityStep by Step Solution