Question: For the project outlined in the following table, prepare (a) a bar chart, (b) an AOA network diagram, and (c) a AON diagram. (d) What
For the project outlined in the following table, prepare (a) a bar chart, (b) an AOA network diagram, and (c) a AON diagram. (d) What and how long is the critical path?
Task Follows Task(s) Duration (Weeks)
A Start 3.0
B Start 7.0
C A 2.0
D B 7.0
E B, C 5.0
F D, E 1.0