Question: For this assignment you are using Microsoft Excel to perform a life cycle cost analysis on system XYZ considering the following factors. System XYZ is
For this assignment you are using Microsoft Excel to perform a life cycle cost analysis on system XYZ considering the following factors. System XYZ is installed in an aircraft that will be deployed at four operational bases. Each base will have a maximum force level of aircraft with the bases being activated in series base at the end of year for operation in year base at the end of year for operation in year base at the end of year for operation in year and base at the end of year for operation in year The total number of system XYZs in operation are as shown in the table below. Note that there is a decline in the number of units required beginning in year Also, note over production in year as some XYZ systems are kept at the Depot as spare units to put in operation when needed.
Year Number
System XYZ is a newly designed configuration packaged in three units Unit A Unit B and Unit C The specified requirements for each of the units are shown in the Figure below. The only system level maintenance that is required is configuration of unit B following a corrective maintenance action of this unit. The configuration takes minutes to complete.
The average System XYZ utilization is hours per day, days per year. One of the aircraft crew members will be assigned to operate several different systems throughout flight, and it is assumed that of the crew member's time is allocated to System XYZ
Relative to the maintenance concept, System XYZ incorporates a builtin selftest that enables rapid system checkout and fault isolation to the unit level. No external support equipment is required at the aircraft. In the event of a nogo condition, the fault is isolated to the unit, and the applicable unit is removed, replaced with a spare, and the damaged unit is sent to the intermediatelevel maintenance shop located at the operational base for repair. The corrective maintenance time for each unit includes the remove and replace action as well as repair of the unit to restore it to operation. This unit repair is accomplished by identifying modules within the unit that are damaged and replacing the modules to restore the unit to operation. Therefore, the corrective maintenance involves removal and replacement of the unit and the module replacement, below the unit level, to restore the unit to operation. The restored unit is placed back into inventory for use as spares. The replaced damaged modules, below the unit level, are discarded.
Scheduled preventive maintenance is accomplished on Unit A in the intermediate shop every months. No depot maintenance is required; however, the depot does provide backup supply and support functions as required.
The requirements for system XYZ dictate the program profile shown in the figure on the next page. Assume that the life cycle cost are broken down into three categories represented by blocks in the program profile.
Provide a solution to this this life cycle analysis using the attached template. In essence provide cost for each of the years of operation in each of the categories summarized above and numbered as follows:
RDT & E COST:
System XYZ RDT&E sub total cost
System XYZ RDT&E support equipment sub total cost
Production Cost:
Production & Manufacturing cost for unit A B and C
Production Support Equipment
Spare Units
Operations & Maintenance
System Operation Cost
Maintenance Labor Cost
Maintenance Material & Spares Cost
Calculate these costs based on the criteria number through and defined in the problem. Show all work on subsequent worksheets to substantiate cost calculations. Also, for total cost, calculate net present values at discount rate assuming year is time Calculate each individual year NPV value as well as total value and incorporate onto the spreadsheet template. Additional factors and figures are included in screenshot. Please use the following solution table: Year
Cost Category Total
System XYZ RDT&E Sub Total
RDT&E Support Equipment Sub Total
Sub Total RDT&E
System XYZ Production Subtotal
Production Support Equipment Subtotal
Spare Units Sub Total
Sub Total Production
Total Operating Cost Sub Total
Total System Level Maintenance Cost Sub Total
Total Mainteance Material Cost
Sub Total Operations & Maintenance
Totals
Totals @ Discount
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock