Question: Four components are assembled in a lab projector. The projector requires component A, B, and either C or D to function. If the reliability of

Four components are assembled in a lab projector.Four components are assembled in a lab projector.

Four components are assembled in a lab projector. The projector requires component A, B, and either C or D to function. If the reliability of each of the components is 0.55, what is the overall reliability of the projector? a. 0.26 b. 0.09 C. 0.1 d. 0.24 e. 0.13 A work shop has a daily demand of 18 units of rubber floor mats. The maximum output capacity of the shop is 9 and the shop does not carry inventory. The shop operates for 3 hours in the morning and then 160 minutes in the afternoon. What is the cycle time in hours) for floor mats. a. 9.06 b. 0.61 C. 0.33 d. 0.31 e. 18.11 f. 0.17

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!