Question: Four products (1, 2, 3 and 4) must be processed on one of four machines (A, B, C and D). The times required in minutes

Four products (1, 2, 3 and 4) must be processed on one of four machines (A, B, C and D). The times required in minutes for each product on each machine are shown below. Machine Product B C D 10 9 16 12 2 14 17 5 3 19 20 11 7 4 8 5 10 18 If management wishes to assign products to machines so that the total time to complete all the products is minimized, then Product 4 is assigned to Select one A. machine B. machine D. C machine B. D. machine A