Question: From Me > HW 9.6: A gold processor has two sources of gold ore, source A and source B. In order to keep his plant

From Me > HW 9.6: A gold processor has two
From Me > HW 9.6: A gold processor has two sources of gold ore, source A and source B. In order to keep his plant running, at least three tons of ore must be processed each day. Ore from source A costs $20 per ton to process, and ore fro and ore from source B costs $10 per ton to process. Costs must be kept to less than $80 per day. Moreover, Federal Regulations require that the amount of ore from source B cannot exceed twice ed twice the amount of ore source A. If ore from source A hint of ore from source A. yields 2 oz. of gold per ton, and ore from source B yields 3 oz. of gold per ton, how many tons of ore from both sources must be processed each day to maximize the amount of gold extracted subject to the above constraints? 2. In order to ensure optimal health (and thus accurate test results), a lab technician needs to feed the rabbits a daily diet containing a minimum of 24 grams (g) of fat, 36 g of carbohydrates, and 4 g of protein. But the rabbits should be fed no more than five ounces of food a day. Rather than order rabbit food that is custom-blended, it is cheaper to order Food X and Food Y, and blend them for an optimal mix. Food X contains 8 g of fat, 12 g of carbohydrates, and 2 g of protein per ounce, and costs $0.20 per ounce. Food Y contains 12 g of fat, 12 g of carbohydrates, and 1 g of protein per ounce, at a cost of $0.30 per ounce. What is the optimal blend? 3. A calculator company produces a scientific calculator and a graphing calculator. Long-term projections indicate an expected demand of at least 100 scientific and 80 graphing calculators each day. Because of limitations on production capacity, no more than 200 scientific and 170 graphing calculators can be made daily. To satisfy a shipping contract, a total of at least 200 calculators must be shipped each day. If each scientific calculator sold results in a $2 loss, but each graphing calculator produces a $5 profit, how many of each type should be made daily to maximize net profits? 4. You need to buy some filing cabinets. You know that Cabinet X costs $10 per unit, requires six square feet of floor space, and holds eight cubic feet of files. Cabinet Y costs $20 per unit, requires eight square feet of floor space, and holds twelve cubic feet of files. You have been given $140 for this purchase, though you don't have to spend that much. The office has room for no more than 72 square feet of cabinets. How many of which model should you buy, in order to maximize shorage volume? 5. A potter is making cups and plates. It takes her 6 minutes to make a cup and 3 minutes to make a plate. Each cup uses 3/4 lb. of clay and each plate uses one lb. of clay. She has 20 hours available for making the cups and plates and has 250 lbs. of clay on hand. She makes a profit of $2 on each cup and $1.50 on each plate. How many cups and how many plates should she make in order to maximize her profit? 6. A plant makes aluminum and copper wire. Each pound of aluminum wire requires 5 kwh of electricity and 1/4 hr. of labor. Each pound of copper wire requires 2 kwh of electricity and 1/2 hr. of labor. Production of copper wire is restricted by the fact that raw materials are available to produce at most 60 Ibs./day. Electricity is limited to 500 kwh/day and labor to 40 person- hrs./day. If the profit from aluminum wire is $.25/lb. and the profit from copper is $.40/lb., how much of each should be produced to maximize profit and what is the maximum profit? Page 14

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Mathematics Questions!