Question: Geotechnical Engineering ( CEGR 3 2 7 8 ) Phase Diagram Relationships Example 1 : The specific gravity of the soil solids of a saturated

Geotechnical Engineering (CEGR 3278)
Phase Diagram Relationships
Example 1: The specific gravity of the soil solids of a saturated sample is 2.75. The porosity of the specimen is 30%. What is the total unit weight and density of this soil specimen?
GIVEN:
,s=2.75=
spectlity Gs=2.75=ysyw=wsvs(1yw)=wsvs(19.81)
2.75=y5yw=9.81
yw
n%=30%=Vvv100=vwV100 saturated
ys=26.971
cs=PsPw
yw=9.81knm3=ww,V=.30=Vv(V)
2.75=ps100
S0,0=vwvv100=100,yw=wwVw
ps=275
Yis
FIND:
SOLUTION:
Phase Diagram Solution Method
Determine number of phases and DRAW phase diagram
Include all given info on the diagram (weight or mass, volume)
Wa and Ma=0(negligible)
Define all EQUATIONS and variables
w and w are KNOWN CONSTANTS - write out full equation!
Break down the Gs equation if this value is given
Don't confuse subscripts: ds
Don't confuse mass with weight
ASSUME a volume (but only if needed)
MANIPULATE the equations to soLve
Geotechnical Engineering ( CEGR 3 2 7 8 ) Phase

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!