Question: Give correct answer your Answer will be Voted 40 Problem 4: A work-study sample of a manufacturing activity conducted over a 40-hour period shows that

Give correct answer your Answer will be Voted
40 Problem 4: A work-study sample of a manufacturing activity conducted over a 40-hour period shows that a worker with an 85% rating produced 12 parts. The worker's idle time was 10% and the allowance factor was 12% Find the Normal and Standard time for this activity. Problem 5: Jim and Bob recently time-studied a janitorial task. From a sample of 75 observations, they computed an average cycle time of 15 minutes with a standard deviation of 2 minutes. Was their sample large enough that one can be 99% confident that the standard time is within 5% of the true value? Problem 6: Consider the following task broken down into 5 MTM elements: TMUS 14.2 3.5 10.6 Code in MTM Books R12D BG1 AP2 Reach to tool box Grasp a tool Separate tool by pressing Turn tool Move and focus eyes T45S 3.5 13.4 M12B What is the total time for the taskStep by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock