Question: Given a study area with 4 traffic analysis zones ( TAZs ) , the following table gives the total numbers of trip production and attraction

Given a study area with 4 traffic analysis zones (TAZs), the following table gives the total numbers of trip
production and attraction for each TAZ.
The second table (as shown below) gives the travel time (in minute) matrix from one TAZ to another.
Assume the friction function:
Fij(tij)=exp(+tij)
Ignore socioeconomic factor (i.e.,Kij=1). And assume =-0.15, and =-0.8
(1) Determine the matrix of friction factors (from one TAZ to another).(30 pt)
(2) Given the convergence error as 0.1%, using the doubly constraints on the numbers of both trip
productions and attractions, determine the final matrix of trip distributions between TAZs. (70 pt)
(Hint: Use Excel to solve these two problems, and copy the matrix of each iteration to the Word
document with necessary explanations. A single Excel document is NOT accepted)
Given a study area with 4 traffic analysis zones

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!